How Much Does an Electrical Panel Upgrade Cost?Dordrecht, South Holland

Detailed pricing and cost information for Dordrecht, South Holland.

An electrical panel upgrade costs $1,500–$4,000 in the US for a standard 100-to-200-amp upgrade, with complex jobs reaching $6,000+. In Poland, expect PLN 3,000–8,000 and in the Netherlands €1,500–€5,000. Upgrading your panel increases your home's electrical capacity to safely handle modern appliances, EV chargers, and HVAC systems.

Average panel upgrade costs

Project typeTypical cost (USD)
Replace breakers only (no panel swap)$200–$500
100-amp to 200-amp panel upgrade$1,500–$4,000
200-amp to 400-amp upgrade$3,000–$6,000
Add a subpanel (60–100 amp)$500–$2,000
Meter + panel combo (meter-main)$2,000–$5,000
Replace Federal Pacific or Zinsco panel$2,000–$4,500

Sources: HomeAdvisor 2025, Angi, NFPA data.

What affects the cost?

  • Amperage increase — jumping from 100A to 200A is standard; 400A upgrades for large homes or shops cost significantly more
  • Utility coordination — the power company may need to upgrade the meter, service entrance cable, or the feed from the transformer, adding $500–$2,000+
  • Code compliance — older panels may need grounding upgrades, AFCI/GFCI breakers, and updated wiring to meet current NEC requirements
  • Panel brand and type — standard panels cost $300–$600; smart panels with load management (Span, Lumin) cost $3,000–$6,000+ for the hardware alone
  • Location of the panel — exterior relocations or moving a panel to a new wall adds labor and materials
  • Permits and inspections — required in virtually all US jurisdictions; typically $75–$300

Panel upgrade costs in the United States

The most common upgrade — replacing a 100-amp panel with a 200-amp panel — costs $1,500–$4,000 in most markets. This includes a new panel box, 200-amp main breaker, moving circuits to the new panel, and labeling. If the service entrance cable (from the meter to the panel) also needs upgrading, add $1,000–$2,500. Utility coordination for a new meter socket can take 2–6 weeks.

Panel upgrades are increasingly necessary for homeowners installing EV chargers (Level 2 chargers draw 40–60 amps), heat pumps, or home battery systems. If your panel is a Federal Pacific StabLok, Zinsco, or GTE/Sylvania, replacement is urgent — these panels have known fire safety defects. Always hire a licensed electrician; all panel work requires permits.

Panel upgrade costs in Poland

In Poland, replacing a rozdzielnica (distribution panel) costs PLN 3,000–8,000 for a standard residential upgrade. A basic apartment panel swap runs PLN 2,000–4,000. Upgrading to a 3-phase panel for a house costs PLN 4,000–8,000. Modern panels with RCD (differential current) protection are now required by Polish building codes for new installations.

Panel work must comply with PN-HD 60364 standards. The electrician needs SEP E1 certification. For increased power allocation from the grid (przyłącze), contact your local energy distributor (e.g., PGE, Tauron) — this process can take weeks and has separate fees.

Panel upgrade costs in the Netherlands

Dutch panel (groepenkast) replacement costs €1,500–€5,000 including BTW. A standard 1-phase upgrade with 12–16 groups runs €1,500–€3,000. Upgrading to 3-phase for EV charging or heat pumps costs €2,500–€5,000, plus potential network operator (Liander, Stedin, Enexis) fees for a heavier connection. Modern groepenkasten include aardlekschakelaars (RCDs) and per-group MCBs.

Dutch installations must meet NEN 1010 standards. After major work, an inspection (NEN 3140) is recommended. Use an erkend installateur for warranty and insurance compliance.

How to save on panel upgrade costs

  • Get 3+ quotes — panel upgrade pricing varies 25–40% between electricians
  • Combine with other electrical work — adding circuits during a panel upgrade is cheaper than a separate visit later
  • Standard panels over smart panels — a standard 200A panel is $300–$600 vs $3,000–$6,000 for a smart panel; only choose smart if you need solar/battery/EV load management
  • Handle utility coordination early — meter and service upgrades from the utility can delay the project weeks; start early
  • Check rebate programs — many utilities offer rebates for panel upgrades tied to electrification (heat pumps, EV chargers)

Learn about the trade

Electrician licensing in Netherlands

Find a provider in Dordrecht

Panel upgrade in Dordrecht

Other cities in South Holland

Other cities