Solar PV installation requires a building permit, an electrical permit, and a utility interconnection agreement in every market we cover. Some US cities (SolarAPP+ jurisdictions) issue same-day automated permits. EU permitting is generally lighter than US but always requires grid-operator notification.

Do you need a permit?

Usually yes

Typical fee
€150–€800

What triggers a permit

  • Installing rooftop or ground-mount PV arrays of any size
  • Adding battery storage (ESS — energy storage system)
  • Net-metering or feed-in tariff registration with the utility
  • Mounting penetrations through the roof envelope

Country-specific detail

Spanish PV installations under 100 kW use the simplified RD 244/2019 self-consumption regime — declaration to the autonomous community's industry department plus a connection request to the distribuidora. Municipal licencia de obra menor is required for installation work. IBI (property tax) bonifications up to 50% available in many municipalities.